Heavy Duty Industrial Racking Systems
Steel Material Grade
Q355B Extra Heavy Structural H-Beam & Steel Plate
Standard Dimensions
Bay Widths 1.5m - 2.2m, Depths up to 1.2m
Protective Finish
Heavy Duty Industrial Enamel / Galvanized Decks
Engineering Codes
FEM 10.2.02 / RMI 2012 / ISO 9001
Extreme-Capacity Slide-Out Die & Mold Storage
Specially engineered for manufacturing tool rooms, injection molding plants, and metal stamping facilities storing ultra-heavy casting dies, injection molds, and stamping tooling.
Key Engineering Features:
- Heavy-duty sliding drawer shelves support up to 2,000 kg - 5,000 kg per level.
- 100% drawer pull-out extension allows direct overhead crane hoist access.
- Automatic mechanical drawer safety locks prevent multiple shelves from opening simultaneously.
- Substantially reduces tooling changeover time and eliminates mold floor damage.
Quality Assurance Guarantees:
Robotic MIG/MAG seam welding with 100% penetration
Positive spring locking safety pins on all connectors
High-capacity seismic floor baseplates with expansion anchors
Automated 7-stage chemical wash pretreatment before powder coat
Manufacturing & Structural Tolerances
| Raw Material Steel Grade | Q355B / Q235B High-Yield Cold-Formed Structural Steel |
|---|---|
| Yield Strength Limit | Minimum 355 MPa (51,500 psi) guaranteed yield point |
| Upright Profile Geometry | 90mm - 140mm roll-formed omega profile with stiffening ribs |
| Length Tolerance | Strict dimensional tolerance within ±0.5 mm per bay height |
| Beam Deflection Ratio | Engineered below L/200 under maximum rated payload (zero sag) |
| Connector Endplates | 3-claw and 4-claw heavy forged claw brackets with safety pins |
| Finish Cure Temperature | Electrostatic polyester powder cured at 200°C for lifetime adhesion |
10-Year Comprehensive Structural Warranty
Backed directly by Bodor Rack Industries Ltd. Plant EngineeringAll structural steel upright columns, box beams, cantilever arms, and seismic baseplates are warranted against structural failure, material defects, or weld separation for a period of ten (10) full years from completion of installation when operated within engineered load ratings.
Annual structural inspection and laser alignment calibration audits are available through our nationwide field engineering division.