Industrial Furniture
Steel Material Grade
Structural Box Channel & Cold-Formed Guides
Standard Dimensions
Custom Built for Assembly Line Part Carts
Protective Finish
Safety Yellow / Industrial Blue Powder Coat
Engineering Codes
FEM 10.2.02 / RMI 2012 / ISO 9001
Assembly Line Raw Material Input Rack
Dedicated staging racks installed directly alongside manufacturing production lines to feed components, stamped sheet metals, and sub-assemblies directly to line operators with zero clutter.
Key Engineering Features:
- Ergonomic 20-degree tilted shelves for effortless line-side parts visibility and pick reach.
- Roller tracks enable FIFO gravity feed of parts bins and KLT plastic containers.
- Heavy floor anchors protect against forklift bump impacts at line changeovers.
- Modular add-on bays can be expanded as production assembly volumes scale.
Quality Assurance Guarantees:
Robotic MIG/MAG seam welding with 100% penetration
Positive spring locking safety pins on all connectors
High-capacity seismic floor baseplates with expansion anchors
Automated 7-stage chemical wash pretreatment before powder coat
Manufacturing & Structural Tolerances
| Raw Material Steel Grade | Q355B / Q235B High-Yield Cold-Formed Structural Steel |
|---|---|
| Yield Strength Limit | Minimum 355 MPa (51,500 psi) guaranteed yield point |
| Upright Profile Geometry | 90mm - 140mm roll-formed omega profile with stiffening ribs |
| Length Tolerance | Strict dimensional tolerance within ±0.5 mm per bay height |
| Beam Deflection Ratio | Engineered below L/200 under maximum rated payload (zero sag) |
| Connector Endplates | 3-claw and 4-claw heavy forged claw brackets with safety pins |
| Finish Cure Temperature | Electrostatic polyester powder cured at 200°C for lifetime adhesion |
10-Year Comprehensive Structural Warranty
Backed directly by Bodor Rack Industries Ltd. Plant EngineeringAll structural steel upright columns, box beams, cantilever arms, and seismic baseplates are warranted against structural failure, material defects, or weld separation for a period of ten (10) full years from completion of installation when operated within engineered load ratings.
Annual structural inspection and laser alignment calibration audits are available through our nationwide field engineering division.