Savar Industrial Park Tri-Tier Mezzanine Fulfillment Hub

Mezzanine Floors Completed 2025

Savar Industrial Park Tri-Tier Mezzanine Fulfillment Hub

High-load rack-supported multi-tier mezzanine platform that tripled the active order picking footprint. Complete with safety drop gates, heavy carton-flow shelving aisles, and integrated vertical pallet lifts.

Technical Specifications & Project Scope
Client / Facility
FastTrack FMCG & E-Commerce Logistics
Installation Site
Savar, Dhaka, Bangladesh
Rated Capacity
65,000 sq.ft Usable Storage Floor Area
Operational Volume
3 Structural Tiers • Heavy Steel Grating Deck • Conveyor & Spiral Chute Ready

Engineering & Execution Process

Seismic & Load Calculation

Structural layout designed according to EN 15512 and FEM standard racking codes to withstand heavy forklift traffic and seismic moments.

Automated CNC Roll-Forming

Continuous robotic cold-roll formed uprights and beams manufactured from Q235B/Q355B certified structural high-yield steel coils.

Turnkey On-Site Rigging & Handover

Certified installation engineers oversee laser floor leveling, upright anchoring, load testing, and formal safety certification.

Savar Industrial Park Tri-Tier Mezzanine Fulfillment Hub
Verified Storage System Commissioning

"The engineering precision and installation timeline delivered for FastTrack FMCG & E-Commerce Logistics maximized available vertical cubic clearance and improved pallet throughput immediately upon handover."

ISO 9001 / CE Certified Rack Commissioned Engineer
Have a custom warehouse footprint? Our technical drafting department will map out your racking CAD layout free of charge.
Case Studies

More Recent Installations

View All Works
Chat with Engineers on WhatsApp
Bodor Rack Industries Ltd.
Plant Engineering • Online