Global 3PL Mega-Hub Logistics Center

Selective Pallet Racking Completed 2025

Global 3PL Mega-Hub Logistics Center

Turnkey installation of 6-tier heavy-duty selective pallet racking engineered for continuous high-throughput reach-truck operations. Features seismic category D baseplates, heavy galvanized wire decking, and wrap-around column protectors.

Technical Specifications & Project Scope
Client / Facility
Penske / Apex Logistics Park
Installation Site
Chicago, IL
Rated Capacity
24,000 Pallet Positions (3,500 kg/beam)
Operational Volume
1,450 Bays • 12.5m Uprights • 100% Reachability

Engineering & Execution Process

Seismic & Load Calculation

Structural layout designed according to EN 15512 and FEM standard racking codes to withstand heavy forklift traffic and seismic moments.

Automated CNC Roll-Forming

Continuous robotic cold-roll formed uprights and beams manufactured from Q235B/Q355B certified structural high-yield steel coils.

Turnkey On-Site Rigging & Handover

Certified installation engineers oversee laser floor leveling, upright anchoring, load testing, and formal safety certification.

Global 3PL Mega-Hub Logistics Center
Verified Storage System Commissioning

"The engineering precision and installation timeline delivered for Penske / Apex Logistics Park maximized available vertical cubic clearance and improved pallet throughput immediately upon handover."

ISO 9001 / CE Certified Rack Commissioned Engineer
Have a custom warehouse footprint? Our technical drafting department will map out your racking CAD layout free of charge.
Case Studies

More Recent Installations

View All Works
Chat with Engineers on WhatsApp
Bodor Rack Industries Ltd.
Plant Engineering • Online